Tuesday, October 12, 2010

10MW offshore wind turbine

This is a bit old news but I thought it was interesting in several ways. This is Arup’s Aerogenerator X visualized by architects Grimshaw. The diameter is 274 meters and an innovative design and construction that can generate 10MW and new versions in the future possibly up to 20MW.

"In order to reduce the fatigue stress, the blade sections and thicknesses are increased which further increases the blade self-weight. These issues continue throughout the device. Drive-train mountings must be stiff enough to support the heavier components inside the nacelle on top of the tower, otherwise the systems can become misaligned and the support structure is also exposed to extremely large dynamic thrust and bending stresses, which are amplified significantly with any increase in water depth".

The innnovative design is the conclusion of an 18-month feasibility study called the NOVA project undertaken by Cranfield University, QinetiQ, Strathclyde University, Sheffield University and Wind Power Limited supported by consultant engineers and project managers. The NOVA feasibility project was funded by the Energy Technologies Institute, a public private partnership comprising BP, Caterpillar, EDF, E.ON, Rolls-Royce, Shell, BP, EDF, EON, Caterpillar, the UK Government and Wind Power Limited.

More at Arup.

1 comment:

  1. This comment has been removed by a blog administrator.

    ReplyDelete

Some of the latest blog posts

Subscribe to RSS headline updates from:
Powered by FeedBurner

Contact Us | About JTB World | Subscribe to this blog
JTB World's website | Website General Terms of Use | Privacy Policy
^ Top of page

© 2004- JTB World. All rights reserved.